A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down. Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?
A. Configure Etherchannel between the client LPARs and the two VIO servers
B. Implement PowerHA SystemMirror on both VIO servers.
C. Implement Shared Ethernet Adapter failover and have all client partitions access the network through the shared adapters.
D. Configure Network Interface Backup between the two VIO servers and use each VIO server to access the network.
正解:D
質問 2:
A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?
A. Reserve Capacity on Demand
B. Utility Capacity on Demand
C. Capacity Upgrade on Demand
D. Uncapped Capacity on Demand
正解:C
質問 3:
A system administrator has been instructed to attach storage in their client LPARs, in a Power 770, with fibre channel adapters using N_port ID virtualization (NPIV).Which of the following partitions has the minimum requirements to utilize virtual fibre channel?
A. LPAR-D with 8Gb FC HBA and SAN connection
B. LPAR-C with 4Gb FC HBA and SAN connection
C. LPAR-B with 2Gb FC HBA and SAN connection
D. LPAR-A with 1Gb FC HBA and SAN connection
正解:A
質問 4:
What is used as the management interface to create dual VIO Servers on a PS704 Blade?
A. ASMI
B. IVM
C. SDMC
D. HMC
正解:C
質問 5:
A customer is considering consolidating several stand alone x86 systems. The following two options are being considered:
1) A larger x86 processor than is currently installed using VMWare
OR
2) A POWER7 processor-based system using PowerVM.
They have reliable benchmark data for the proposed systems in a single workload environment comparing the proposed x86 and
Power Systems.
How should the processing demand of the target system be calculated?
A. Combine the raw performance ratings of the individual workloads, and add overhead for VMWare on the x86 platform.
B. Combine the raw performance ratings of the individual workloads.
C. Combine the raw performance ratings of the individual workloads, and add overhead for PowerVM on the Power Systems platform.
D. Combine the raw performance ratings of the individual workloads, and add overhead for both VMWare and PowerVM on their respective platforms.
正解:A
質問 6:
A customer has a Power 750 with the following: One processor card with 8 cores enabled, and 64GB RAM installed One GX+ adapter with one I/O drawer attached One 4-port 1Gbps IVE adapter PowerVM Standard Edition They need to add a GX++ adapter and cable it to an I/O drawer.
Which of the following must also be ordered?
A. An additional cable-management arm
B. PowerVM Enterprise Edition
C. A second processor card
D. A second IVE adapter
正解:C
質問 7:
A new customer wants to install a Power 750 in a warehouse location that has no local staff to support it. They are concerned about hardware support and would like to have the system notify IBM service if there is an issue.Which actions will address the customer concern?
A. Use the HMC to enable reporting through Electronic Service Agent.
B. Use IVM to enable console mirroring to IBM Remote Support.
C. Enable automatic problem reporting from smit
D. Enable Automatic Problem Reporting in ASMI using he embedded modem on the FSP.
正解:A
質問 8:
Which of the following functions can be performed using the Integrated Virtualization Manager?
A. Management of Capacity on Demand
B. Hot add/remove of I/O drawers
C. Management of virtual storage
D. Concurrent firmware updates
正解:C
Fujiwara -
最新試験に対応してますし、教科書と過去問題も、この000-106問題集一つに集約していて素晴らしいですね。ありがとうございます。