Refer to the exhibit.
Avaya 7003-1 Exam
A Communication Server 1000E Rls. 7 x customer is adding a new Human Resources department with eight IP telephone users. The customer has asked for the telephones to be programmed with consecutive Directory numbers (DNs) from their DID range (2000-2099).
Which numbers sequence is available to meet the customer's requirements?
A. 2001-2008
B. 5091-2098
C. 2010-2017
D. 2050-5057
正解:B
質問 2:
A customer has a Communication Server (CS) 1000E Rls. 7 x system with a System Manager as the primary Security Server that has been designated as a Deployment Server. The application file (.nai) has been uploaded to the deployment manager library. The customer has added an element to the security domain and wants to deploy software applications to the element.
With respect to deployment services, which statement is false?
A. Deployment Manager has logic to prevent applications being deployed on unsupported hardware platform.
B. MAS can be deployed on the same server as Session Manager.
C. MAS application has its own separate .nai file.
D. IM & Presence application has its own separate .nai file.
正解:B
質問 3:
A customer is preparing to install software on the CPMG server and would like to display the boot sequence on the system terminal for the BIOS, BOOT ROM, and operating System.
Which port on the CPMG server provides this information?
A. Backplane 3-port connection TTY port 0
B. Frontface TTY PORT 1
C. Frontface TTY port 2
D. Frontface embedded LAN (ELAN) port 0
正解:B
質問 4:
Your customer has requested you add the Call Park Feature to their Communication Server 1000 Release 7x system. You have been asked to assign at least eight consecutive numbers that can be used to park calls.
Which CLI overlay and command will provide you with numbers that are unassigned and available?
A. LD 20 / REQ / LUVU
B. LD 20 / REQ / LUU
C. LD 20 / REQ / LUC
D. LD 20 / REQ / LUDN
正解:D
質問 5:
A technician is completing the configuration of a new IP node for a system. All files have been transferred and synchronized, and 'restart applications' is clicked for the selected servers.
What will this cause the system to do?
A. Restart the signaling server application on selected servers.
B. Restart Jboss and the Signaling Server applications on the selected servers.
C. Reboot the Linux Server running the signaling server.
D. Restart the application on selected servers.
正解:D
質問 6:
A technician is installing the Linux Base Operating System software on the CPDC server for the Avaya Aura system and steps away while the software is loading. When the technician returns, he verifies that the Linux base installation is complete and successfully installed.
What status can the technician verify to ensure the installation is successful?
A. The Linux server reboots and the Linux Status Completion screen appears.
B. The Linux server reboots and the FQDN login prompt appears.
C. There is no visible indication available.
D. The status of Linux Hardening items is displayed and the system reboots.
正解:B
宫川** -
ほぼ満点に近い点数で7003.1の試験に合格できた
7003.1試験に、短期間で一発合格するための試験対策本です。