What is the advantage of using a key figure scheme in drilldown reports in profitability analysis?
A. The key figure scheme allows quick access to predefined key figures in the database.
B. A key figure scheme allows for simultaneous access to different databases.
C. A key figure scheme improves the runtime of the drilldown report.
D. The key figure scheme allows the calculating of lines with subtotals in a drill down report.
正解:D
質問 2:
Which of the following fields are required to create a cost center in management accounting (CO)?(Choose two)
A. Company code
B. User responsible
C. Hierarchy area
D. Description
正解:A,C
質問 3:
How can you set up a valuation based on a cost estimate in costing-based profitability analysis? (Choose three)
A. By assigning the costing variant to valuation variant.
B. By assigning the costing key to value fields.
C. By assigning the costing key to material types.
D. By assigning the costing variant in the costing key.
E. By assigning the costing key to products.
正解:C,D,E
質問 4:
Which of the following management accounting (CO) components requires an operating concern?
A. Overhead Cost Controlling
B. Profitability Analysis
C. Product Cost Accounting
D. Profit Center Accounting
正解:B
質問 5:
Which of the following integration scenarios exist in SAP ERP?(Choose two)
A. Fl integration with Payroll
B. PA master data with CO cost centers
C. Cross-Application Time Sheet (CATS) integration with PP confirmations
D. Personnel Cost Planning with Asset Accounting (FI-AA)
正解:B
質問 6:
Which of the following transactions can generate commitments on CO objects automatically?(Choose two)
A. Purchasing quotation
B. Purchase order
C. Purchasing contract
D. Purchase requisition
正解:B,D
質問 7:
Identify the four main Types of roadmaps reviewed. (Choose four)
A. Upgrade Roadmap
B. Download Roadmap
C. Implementation roadmap
D. Solution Roadmap
E. Solution Management Roadmap
F. Global template roadmap
正解:A,C,E,F
質問 8:
A company wants to prevent postings of more than 5000 EUR on cost centers by generating an error message. What do you recommend?
A. Creating a lock amount on the control tab in the cost center master data.
B. Creating a substitution rule in the IMG.
C. Activating and using availability control for cost centers.
D. Creating a validation rule in the IMG.
正解:D
質問 9:
How can you achieve periodic controlling when a lot size based production scenario is
used by logistics?(Choose two)
A. Use an internal order in addition to the production order.
B. Adjust the costing type of the plan costing variant.
C. Use a product cost collector in addition to the production order.
D. Adjust the default rule in the default values for the production order type.
正解:C,D
纯名** -
ボリューム的に足りないかな?と心配しましたが、そんなことはありませんでした。Pass4Testいいね。念を入れたい人は本書を導入とした上で過去問中心の参考書も併用することをPass4Testおすすめします。