Which steps must you perform to activate the usage history for equipment?(Choose two)
A. Activate the usage history for each piece of equipment in the master record.
B. Set the Usage History indicator for the maintenance plant.
C. Activate the usage history for the equipment category.
D. Define history-related fields for the relevant equipment reference category.
正解:C,D
質問 2:
Which of the following is a function of deadline monitoring (transaction IP30)?
A. Generate a Logistics Information System (LIS) report for all overdue maintenance calls.
B. Convert maintenance calls into call objects within a specific period.
C. Convert maintenance notifications into maintenance orders within a specific period.
D. Generate a Logistics Information System (LIS) report for scheduled maintenance items within a specific period.
正解:B
質問 3:
A maintenance plan has a completion requirement. The plan contains five maintenance items that produce five notifications.
Which system status must each notification have before the maintenance call is completed and the next maintenance call can be generated?
A. ATCO (All Tasks Completed)
B. REL (Released)
C. TECO (Technically Completed)
D. NOCO (Notification Completed)
正解:D
質問 4:
Which of the following Customizing settings is required to assign a notification to a maintenance order operation?
A. Assignment of order type to notification type
B. Create default value profiles for general order data
C. Maintain indicator for notification data on order header
D. Assignment of operations to all object list entries active
正解:D
質問 5:
In order costing configuration, for what is the allocation structure used?
A. To determine the cost elements that are allowed in the plant maintenance order
B. To allocate costs to a hierarchy of maintenance technical objects
C. To determine the settlement receiving elements for costs debited to the order
D. To provide a method of consolidating costs in the Plant Maintenance Information System
正解:C
質問 6:
What are the prerequisites for the calculation of planned costs in an order?(Choose three)
A. The order operations must have a control key with the Costing indicator set in Customizing.
B. The costing indicator must be set in Customizing for order types.
C. The user must save the order or execute the Determine costs function.
D. A costing variant for planned costs must be assigned to the order type in Customizing for order types.
E. The cost elements must be assigned to the order type in Customizing.
正解:A,C,D
質問 7:
What information does the value category provide in the maintenance order?
A. A summary of costs for multiple cost elements
B. The costs by work center
C. The costs details for individual technical objects
D. The material costs by valuation category
正解:A
質問 8:
To display overhead costs in a maintenance order, you need to assign a costing sheet in Customizing.
To which parameter do you assign the costing sheet?
A. Valuation categories
B. Valuation variant
C. Version for cost estimates
D. Costing type
正解:B
山咲** -
私は1日4時間を3日で合格できました。(ぎりぎりでしたが……一応合格なので…笑)