Which types of objects can be changed with Engineering Change Management (ECM)?(Choose three)
A. Production version
B. Work center
C. Material master
D. Task list
E. Bill of material
正解:C,D,E
質問 2:
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
A. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
B. Assign an appropriate availability checking rule to the material master for the product.
C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
D. Activate the availability check and assign an overall profile in the production scheduling profile.
正解:C
質問 3:
Which of the following master data can be used with process orders?(Choose three)
A. Serial numbers
B. Resources
C. Master recipes
D. Production/resource tools
E. Production versions
正解:B,C,E
質問 4:
What can you use to organize material staging for production orders?(Choose three)
A. Logistics Information System (LIS)
B. Pull list
C. Transfer orders
D. KANBAN
E. Material documents
正解:B,C,D
質問 5:
Which functions can be triggered before releasing a production order?(Choose three)
A. Selection of a BOM
B. Scheduling
C. Selection of a routing
D. Confirmation
E. Stock determination
正解:A,B,C
贵咲** -
C_TSCM42_66試験に受験しまた。証書を取りました。Pass4Testをあなたにお勧めたいです。C_TSCM42_66の問題集は全部最新です。これを覚えて、試験に合格しました。