What are two advantages of using Database Patterns?
A. Simplified user management
B. Virtualized environment
C. Reduced storage consumption
D. Reduced database deployment time
E. Improved IT agility
正解:A,D
質問 2:
A member's current state is "WAITING_FOR_FAILBACK". What does this state imply?
A. The member is quiesced.
B. Another member is waiting to start on this member's host.
C. This member is waiting for failover to complete.
D. This member is waiting to restart on its home host.
正解:D
質問 3:
Which two items are true about automatic database backups via Tivoli Storage Manager?
A. Automatic backups are invoked as online backups excluding transaction logs.
B. The backup image includes OS user account and group settings as well as DB2 registry values.
C. The maximum number of backup images that can be stored is seven; after this the oldest image is deleted automatically when a new image is created.
D. IBM Tivoli Storage Manager must be configured only before the database is created to use this function.
E. IBM Tivoli Storage Manager must be configured before the instance that hosts the database is created to use this function.
正解:C,E
質問 4:
When using db2instance -list on a db2 pureScale cluster the following output is received: (Refer to the exhibit that appears below)
Which statement is NOT correct?
A. Group restart will be initiated if any failure occurs on the primary Cluster Caching Facility (CF).
B. This pureScale cluster has two members and two CFs. Each host has one member and one CF.
C. The restart light process on purenodeO has finished the Member Crash Recovery.
D. When a failure occurs on member 1, the in-flight data will remain locked until the problem on purenodel is fixed.
正解:D
質問 5:
Which two buttons on the Infrastructure Map can be used to determine network utilization of the top of rack switch?
A. Performance view
B. Temperature view
C. LED view
D. Status view
E. Default view
正解:D,E
解説: (Pass4Test メンバーにのみ表示されます)
質問 6:
Which statement about the job schedule is NOT correct?
A. A schedule can be used to define the end time of a job.
B. A schedule can be used to define the start time of a job.
C. A schedule can be used to define the dependency between 2 jobs.
D. A schedule can be used to define the frequency of a job.
正解:B
戸田** -
C2090-310の問題集、読みやすく わかりやすい解説が付き、これで受かる気がしたっと思って受験して本当に受かりました。すごい。