A POWER7 system has two IBM i client partitions utilizing dual VIO Server (VIOS) partitions for all disk & LAN resources. In order to provide uninterrupted operations when either of the VIOS partitions is shut down, what is the minimum number of virtual adapters that must be created in each VIOS partition?
A. 1
B. 3
C. 6
D. 2
正解:B
質問 2:
What are the three types of network adapters that can be assigned to an IBM i client partition?
A. A Fibre Channel over Ethernet adapter An Ethernet adapter in a PCIe slot A Serial over LAN adapter
B. An Ethernet adapter A virtual Fibre Channel adapter A Host Ethernet Adapter
C. A client connect adapter A virtual Opticonnect adapter A Fibre Channel over Ethernet adapter
D. An Ethernet adapter in a PCIe slot A Host Ethernet Adapter A virtual Ethernet adapter
正解:D
質問 3:
An optical drive is owned by a VIO Server and shared between multiple IBM i partitions as virtual optical devices.
An administrator wants to use the virtual optical device on an IBM i partition, but WRKHDWRSC *STG shows that the virtual IOP is "Inoperative."
After verifying that the device is correctly allocated to the partition, what action should be taken?
A. In SST, IPL the virtual IOP and vary on the device
B. On the HMC, modify the host partition profile so that the vSCSI adapter is configured for "Any client partition can connect".
C. On the HMC, select the vSCSI adapter and, under the Advanced option, select the option to Recover the Adapter.
D. Vary off the device on the partition which is currently using the optical drive.
正解:A
質問 4:
A Power 720 system has a VIO Server (VIOS) partition configured completely in the CEO. The VIOS partition hosts IBM i client partitions which require access to the DVD drive in the CEO. How is this accomplished?
A. Use VIOS to map the DVD drive to the IBM i client partition.
B. Use DLPAR to move the DVD drive between partitions as needed.
C. Create a shared vSOSI link from VIOS to each IBM i client partition and mapthe DVD drive to each partition.
D. Create an image catalog in the IBM i client partition and map itto the DVD drive.
正解:A
質問 5:
When attempting to remove a large amount of memory from a partition, the HMC generates an error stating that all the memory requested was not removed.
What can be done to help ensure all the memory gets removed when the request is attempted again?
A. Move the memory to an unallocated shared pool in the partition.
B. Increase the amount of time allocated for the memory removal operation.
C. Change system value QMEMSHRPIRI to *HIGH.
D. Rebootthe HMCto ensure caches are cleared.
正解:B
質問 6:
One partition on a multi-LPAR Power 720 has recently posted an error message about the upcoming expiration of a cache battery.
How can all the other controllers on the partitions be checked to determine if they should have the same type of maintenance performed?
A. On the HMC: Service Management, Manage Serviceable Events
B. On the ASMI: System Service Aids, Battery Management
C. On a workstation: IBM i Access for Windows, Management Central
D. On each partition: System Service Tools, Hardware Service Manager
正解:D
質問 7:
An operator shut down an operating IBM i partition from the HMC. What is the result of this action?
A. RAID integrity may be compromised.
B. The next IPL of the partition will be an abnormal IPL.
C. Objects in disk IOA write cache will be lost.
D. The next IPL will need to be manual and will require a Reclaim Storage to complete.
正解:B
質問 8:
An administrator has an IBM i 7.1 hosting partition with TP 4 installed. The administrator is designing Ethernet communications for 5 client IBM i LPARs. The managed system has only one Ethernet adapter with a single port available.
The partitions must be separated and secured from each other.
Which solution will provide Ethernet connectively at the lowest cost?
A. In each of the client IBM i LPARs, design a packetfilterto only accept inbound packets from the gateway router MAC address.
B. Design an IBM i bridged VLAN for each of the partitions.
C. Design a virtual LAN connecting each LPAR with a different IP subnet.
D. Specifyusing the CCA Cryptographic Service Provider(option 35 of 5770-SS1) to encrypt each of the Ethernet connections with a public/private key combination.
正解:B
質問 9:
A customer has purchased a new BladeCenter H (BCH) and POWER blade to run IBM i. The POWER blade is configured with two Fibre Channel interlaces for attaching SAN and tape.
They have an IBM TS3500 tape library with a fibre channel connection, and current firmware is running through a fibre switch to another IBM i system. One port on the existing switch and one port in the BCH fibre switch has been zoned to provide a connection from the tape library to the BCH.
After IBM i 7.1 SLIC and base OS are installed on the blade from IBM distribution media, the tape library does not appear in the device configuration.
What is the most likely cause of the problem?
A. NPIV enablement was omitted when configuring the BCH switch.
B. The existing switch does not support NPIV.
C. The BCH switch configuration must match the link speed of the TS3500.
D. A switch-to-switch cable is required. A switch to device cable was shipped with the BCH by default.
正解:B