What are two ways the View Builder can be used to manipulate event displays?
A. Define which metric can be calculated to display in the monitor box.
B. Use column formatting, including column widths and alignment of the column headers and data.
C. Define which user have access to view.
D. Define the selection of columns that are shown in the event list.
E. Define the selection of alerts that are shown in the event list.
正解:B,D
質問 2:
When building a filter, which operator would be used to include or exclude multiple values in the search criteria for a column?
A. Out
B. Include
C. Exclude
D. In
正解:D
質問 3:
An IBM Tivoli Netcool/OMNIbus user is being asked to define some filters for specific support groups to use when they are working with event lists. The Operations manager wants to limit the rows displayed in Active Event Lists to 20 for the custom dashboard being created. There are two data sources used for the Active Event Lists. What is the maximum number of events that will be displayed?
A. 10 from each data source
B. all events will be displayed from both data sources
C. 40
D. 20
正解:D
質問 4:
Which statement is true about access levels and roles if a user is assigned to multiple roles?
A. The user acquires the lowest access level between these roles for a resource.
B. The user acquires the last added access level.
C. The user acquires the highest access level between these roles for a resource.
D. The access level between these roles cannot be determined.
正解:C
質問 5:
What is a valid click action for gauges?
A. Show Wires
B. Create Custom Wire
C. Execute AEL Tool
D. Send Event (using wires)
正解:D
質問 6:
When the Generate All check box is selected in the Server Editor, which file will be generated?
A. $NCHOME/omnibus/etc/omni.dat
B. $NCHOME/etc/omni.dat
C. $NCHOME/etc/interfaces
D. $NCHOME/omnibus/etc/interfaces.
正解:D
質問 7:
Which two map objects are available to be added to a map using the Java Map Creation editor?
A. Active Background
B. Lavalamp Monitor
C. Active Curved Line
D. Active Icon
E. Active Portlet
正解:B,D
柏仓** -
C9560-593復習教材は私の多くの時間を節約しました。そして、C9560-593試験に合格しました。ありがとう!