To document the test cases, IEEE 829 will be used. Select TWO elements that are part of the IEEE 829 test design template.
A. Suspension criteria
B. Staffing requirements
C. Approach refinements
D. Test schedule
E. Items to be tested
正解:C,E
質問 2:
Scenario "Supercar"
Supercar is an online vehicle sales website specialising in a single manufacturer's Sports Utility Vehicles (SUVs) and saloons. A vehicle has two key elements, power unit and body style. The manufacturer offers three choices of power unit: petrol, diesel and hybrid. There are 3 main body styles: Saloon, Hatchback and SUV. SUVs only come as petrol and diesel options. Hybrid is available for Hatchback only. The site will allow an order to be processed if at least one of the chosen vehicle configuration is in stock, otherwise a message will be displayed asking the user to try again later.
The development manager asks you to identify suitable test coverage entry criteria for the "Supercar" system test. Which of the following would you recommend as appropriate for entry criteria to a system testing phase?
(i)100% business requirements coverage
(ii)100% statement coverage
(iii)75% decision coverage
(iv)Availability of test release notes
(v)Design review completed
A. (i), (iv), (v)
B. (ii), (iii), (iv)
C. (i), (ii), (iii)
D. (ii), (iv), (v)
正解:B
質問 3:
Based on the specification,
what is an example of a negative test case?
A)
B)
C)
D)
A. Option D
B. Option A
C. Option D
D. Option B
正解:A
質問 4:
Part 2: "Test Analyst various"
Which of the following is the least appropriate action to mitigate risk for a www application? s
A. Allocate more time to high risk areas
B. Run tests in multiple operational environments
C. Initiate reviews of test design
D. Use professional and skilled testers with appropriate technical knowledge
正解:C
質問 5:
Using the scenario as described above, using boundary value analysis, which would be the most interesting test set to explicitly test one single boundary value as defined in the specification?
A. (i)
B. (iii)
C. (iv)
D. (ii)
正解:C
質問 6:
For the project three completion criteria have been defined.
A) Test cases passed more than 70%
B) Number of outstanding defects less than 5
C) Number of defects per test case less than 0,5
The first week of the testing has shown the following results: Evaluate the status of the project at the end of the week against the defined completion criteria. Which of the following options shows the correct status? s
A. Criteria A = OK, criteria B = OK, criteria C = OK
B. Criteria A = OK, criteria B = NOT OK, criteria C = NOT OK
C. Criteria A = NOT OK, criteria B = NOT OK, criteria C = OK
D. Criteria A = NOT OK, criteria B = NOT OK, criteria C = NOT OK
正解:C
二瓶** -
わかりやすい解説が付き、これで受かる気がしたっと思って受験して本当に受かりました。すごい
しかも試験の問題にも入ていて、高得点で受かりました。