What is the correct sequence of the ASAP methodology phases?
A. Project Preparation -> Business Blueprint -> Realization -> Training -> Go Live Support > Run
B. Project Preparation -> Business Blueprint -> Realization -> Final Preparation -> Go Live Support -> Run
C. Plan Project -> Design Solution -> Build Solution -> Test -> Hand Over to IT -> Operate
D. Project Launch -> Requirements and Design -> Build -> Go Live -> Run -> Optimization
正解:A
質問 2:
What is the main idea of SAP NetWeaver Information Lifecycle Management (ILM)?
A. ILM is the new tool to archive SAP NetWeaver Business Warehouse objects.
B. ILM replaces data archiving.
C. ILM complements data archiving with retention management and retention warehousing.
D. ILM is an external storage system delivered by SAP
正解:C
質問 3:
Which data do you need to set up an accrual calculation with the percentage method? (Choose two)
A. Cost center or internal order (order category 2) as credit object.
B. Accrual settlement rules with percentage method.
C. Accrual allocation cycle with sender receiver segments.
D. Secondary cost element (category 31) as accrual cost element.
E. Primary cost element (category 3) as accrual cost element.
正解:A,E
質問 4:
The controlling department requires the production order variances to be settled to profitability analysis. How can you achieve this?
There are 2 correct answers to this question.
Response:
A. Set the To Be Settled in Full indicator in the settlement profile.
B. Assign a PA transfer structure to the settlement profile
C. Assign an allocation structure to the settlement profile.
D. Set the Variances indicator in the settlement profile
正解:B,D
質問 5:
Which master data is required for a direct activity allocation? (Choose three)
A. Activity price
B. Activity type
C. Allocation cycle
D. Cost center
E. Secondary cost element
正解:B,D,E
質問 6:
What is the SAP Solution Manager?
A. It supports throughout the entire life-cycle, from the Business Blueprint to the configuration to production processing.
B. It is an own related database system that can be used as an alternative to databases from other vendors.
C. It is an application that is part of the SAP Supply Chain Management application.
D. It is a robust and lean standard-based platform that enables you to develop Java and composite applications from scratch and on top of existing services.
正解:A
質問 7:
How can you credit internal orders at period-end closing? (Choose two)
A. Use periodic reposting.
B. Use template allocation.
C. Use overhead surcharging.
D. Use settlement.
正解:A,D
質問 8:
Your New GL customer uses real-time reconciliation of CO and FI. The customer wants to show the value flow of activity allocations between cost centers assigned to different profit centers. What does the customer have to configure? (Choose two)
A. Execute the periodic transfer to profit center accounting.
B. Carry out a reconciliation run for activities types in the new GL.
C. Select profit center as a characteristic for real time reconciliation between CO and FI.
D. Define a G/L reconciliation account for direct activity allocation.
正解:C,D