Which of the following statements are true?
(i)
For every development activity there is a corresponding testing activity.
(ii)
Each test level has the same test objectives.
(iii) The analysis and design of tests for a given test level should begin after the corresponding development activity.
(iv)Testers should be involved in reviewing documents as soon as drafts are available in the development life cycle.
A. (ii) and (iii)
B. (i) and (iv)
C. (iii) and (iv)
D. (i) and (ii)
正解:B
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
A test management tool is most likely to integrate with which of the following tools?
A. Performance testing tool
B. Test data preparation tool
C. Requirements management tool
D. Static analysis tool
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 3:
What is the purpose of exit criteria?
A. To identify when to start testing.
B. To identify when to stop testing.
C. To identify how many tests to design.
D. To identify who will carry out the test execution.
正解:B
質問 4:
Which one of the following roles is typically used in a review?
A. Champion.
B. Custodian.
C. Author.
D. Project sponsor.
正解:C
解説: (Pass4Test メンバーにのみ表示されます)
質問 5:
Which of the following best describes the purpose of non-functional testing?
A. To ensure that a system complies with the quality standards set by ISO 9126
B. To ensure that the system deals appropriately with software malfunctions
C. To measure characteristics of a system which give an indication of how the system performs its functions
D. To measure the extent to which a system has been tested by functional testing
正解:C
質問 6:
What can a risk-based approach to testing provide?
A. The total tests needed to provide 100 per cent coverage.
B. Only that test execution is effective at reducing risk.
C. The types of test techniques to be employed.
D. An estimation of the total cost of testing.
正解:C
Miyashita -
私は他のサイトで以前に試験に失敗し、そこでGoogleからPass4Test推薦され、CTFL製品を購入しました。