When is testing complete?
A. When time and budget are exhausted.
B. When there are no remaining high priority defects outstanding.
C. When every data combination has been exercised successfully.
D. When there is enough information for sponsors to make an informed decision about release.
正解:D
解説: (Pass4Test メンバーにのみ表示されます)
質問 2:
For which of the following would maintenance testing be used?
A. Integrating functions during the development of a new system.
B. Correction of defects during the development phase.
C. Complaints about system quality during user acceptance testing.
D. Planned enhancements to an existing operational system.
正解:D
質問 3:
Which of the following would be the most significant input to estimating the time to carry out the specified testing tasks? 3 credits
A. The metrics recorded from testing the capture-replay tool.
B. The number of testers in the company and their grade.
C. The skills and experience of developers to correct the failures.
D. The standards used for the requirements specification.
正解:A
質問 4:
Which of the following are valid reasons for adopting a different life cycle (from the V model), for increments after the first year? 2 credits
i. We do not have a clear understanding of the requirements from a customer perspective.
ii. We see the risk of delivering requested functionality late as being higher than the risk of delivering a lower quality product.
iii. We do not have a budget for additional regression testing which is needed to ensure that existing functionality is not compromised by future iterations.
iv.
The company test strategy does not fit well within the V life cycle model.
A. (ii) and (iii)
B. (i) and (iv)
C. (ii) and (iv)
D. (i) and (ii)
正解:D
質問 5:
Which of the following is a valid drawback of independent testing? 1 credit
A. Developers loose the sense of responsibility and independent testers may become a bottleneck.
B. Developer and independent testing will overlap and waste resources.
C. Independent testers will become a bottleneck and introduce problems in incident management.
D. Independent testers need extra education and always cost more.
正解:A
質問 6:
Within the projects, a master test plan and phase test plan will be used. Following is a list of characteristics applicable for test plans:
a.Any deviation from the procedures described in the test strategy document
b.The overall estimated costs, timescales and resource requirements
c.A detailed schedule of testing activities
d.The development deliverables to be tested
e.Which test staff members (names) will be involved and when
f.Level of requirements coverage achieved
Which THREE of the above mentioned characteristics relate to the master test plan? 1 credit
A. a
B. f
C. e
D. d
E. c
F. b
正解:A,D,F
Banno -
私はCTFLは全くの素人でしたが無事合格する事ができました。このPass4TestサイトのCTFL問題集は解説してあるので理解できました。