Which of the following activities is appropriate to the test planning stage?
A. Writing a test execution schedule
B. Assigning resources for the planned activities
C. Designing the test environments
D. Analysing the test basis
正解:B
質問 2:
A booking system for a city bus service prices its fares according to the time of travel:
* Peak-time tariff starts at 0600 and finishes at 1000 am
* Off-peak tariff applies during all other times of service
* The bus service does not operate between 2300 and the start of the next day's peak service
Note that all times mentioned are inclusive.
When applying the equivalence partitioning test design technique, which of the following options, shows test case inputs that each fall into a different equivalence partition?
A. 1001, 1300, 2259
B. 0100, 0800, 2200
C. 2400, 1000, 2301
D. 0600, 1000, 1200
正解:C
質問 3:
Test objectives for systems testing of a safety critical system include completion of all outstanding defect correction. Regression testing is required following defect correction at all test levels. Which TWO of the following metrics would be MOST suitable for determining whether the test objective has been met? [K2]
a. Regression tests run and passed in systems testing
b. Incidents closed in systems testing
c. Planned tests run and passed in system testing
d. Planned tests run and passed at all levels of testing
e. Incidents raised and closed at all levels of testing
A. b and c
B. a and b
C. a and e
D. d and e
正解:C
質問 4:
What if the project isn't big enough to justify extensive testing..?
A. Use risk based analysis to find out which areas need to be tested
B. Use automation tool for testing
C. Both a and b
D. None of the above
正解:A
質問 5:
A tool that supports traceability, recording of incidents or scheduling of tests is called..?
A. A test execution tool
B. A debugging tool
C. A configuration management tool
D. A dynamic analysis tool
E. A test management tool
正解:E
質問 6:
Which of the following is NOT part of configuration management..?
A. Auditing conformance to ISO9001
B. Record of changes to documentation over time
C. Status accounting of configuration items
D. Identification of test versions
E. Controlled library access
正解:A
質問 7:
Identify the THREE types of formal peer reviews that can be recognized. 1 credit
A. Inspection
B. Audit
C. Assessment
D. Informal review
E. Management review
F. Walkthrough
G. Technical review
正解:A,F,G
質問 8:
Which of the following statements is the MOST valid goal for a test team?
A. Prove that any remaining faults will not cause any failures.
B. Cause as many failures as possible so that faults can be identified and corrected.
C. Prove that all faults are identified.
D. Determine whether enough component testing was executed.
正解:B