You arrive onsite to replace an HDD on an HUS VM system because of a HDD port failure. Which two actions should you perform before replacing the drive? (Choose two.)
A. Set the SVP to Install Mode.
B. Confirm the HDD microcode version.
C. Manually start the dynamic sparing procedure.
D. Verify that the HDD has been spared out.
正解:C,D
質問 2:
A customer wants to create a new CLPR in their HUS VM. Why would you recommend performing this change during a period of low activity?
A. Because the HUS VM cache is in Write Through Mode during the creation of new CLPRs.
B. Because all Host I/Os must be stopped when resources are migrated to the new CLPR.
C. Because adding a CLPR may take a long time and can impact production.
D. Because the LUNs to be moved to the new CLPR must be unmounted or unmapped.
正解:C
質問 3:
What are three functions of the SVP on an HUS VM? (Choose three.)
A. It communicates to the secondary SVP using the heartbeat function.
B. It controls access to production data.
C. It controls the microprogram exchange process.
D. It provides CE access to the maintenance functions.
E. It provides the maintenance LAN interface.
正解:C,D,E
質問 4:
Which three operations are allowed after activating LUN security on an HUS VM Fibre Channel (FC) port? (Choose three.)
A. Add the same WWN to two different Host Groups on the same FC port.
B. Add multiple WWNs to one Host Group.
C. Create host groups with different Host connection modes on the same FC port.
D. Create a Host Group with two different Host connection modes.
E. Add a LDEV to two different Host Groups on the same FC port.
正解:B,C,E
質問 5:
What are three valid license key types on HUS VM storage systems? (Choose three.)
A. term
B. temporary
C. secondary
D. emergency
E. primary
正解:A,B,D