When installing a PMP Access Point antenna on a tower, you need to install it at the proper height. Motorola recommended practice is to mount the antenna at least how many feet/meters below the top of the tower to protect it from lightning?
A. 2 feet/0.6 meters
B. 10 feet/3 meters
C. 25 feet / 8 meters
D. 0 feet / meters
正解:A
質問 2:
When implementing a ring topology with wireless access layer devices for a wide area deployment, what traffic type would most directly impact the network should it lack proper controls and segmentation?
A. Internet Control Message Protocol (ICMP)
B. Broadcast
C. User Datagram Protocol (UDP)
D. Unicast
E. Link Aggregation Control Protocol (LACP)
正解:B
質問 3:
During PTP600 installation, the units must be disarmed or they will:
A. not pass user data.
B. default to 50% UL/DL, regardless of previous settings.
C. immediately enter a reboot cycle,
D. operate, but not at maximum throughput.
正解:D
質問 4:
With regard to Motorola's recommendations, what is the maximum number of APs you can deploy in a FSK cluster with integrated antennas?
A. 6 APs
B. 7 APs
C. 3 APs
D. 4 APs
正解:A
質問 5:
As a general design guideline, the signal strength required to meet a specific target modulation must be exceeded in order to guarantee reliable communications. What is this excess signal strength called?
A. Fade Margin
B. Signal Strength Ratio
C. Diversity Margin
D. Receive Strength Ratio
正解:A
質問 6:
Motorola has a unique market position with a wide breadth and depth of wireless FTP products. This allows our customers to address many business opportunities. These include all of the following EXCEPT:
A. Leased Line Replacement
B. Residential telecom service
C. Video Surveillance
D. Redundant links for fiber installations
E. Public safety communications
正解:B
質問 7:
Scenario
The following question relates to the "Installation' TAB from the Project Description
Template and the information provided by the client (Project Description, Project Details, and Lyymo Map). This is a scenario based question. Please click on the scenario button at the bottom before answering the question.
Rows 3 through 7 of the Project Description Template are related to the installation infrastructure. Based on the information provided, which of the following best represents what should be entered into this section?
A. Option C
B. Option A
C. Option D
D. Option B
正解:B
Mizusaki -
MSC-111の知識としてもこの本を真面目に勉強すれば合格点を取れると思い、余裕でMSC-111に受かりました!!