You no longer have any port availability in the company's switch fabric. There is a decommissioned switch available. When it is installed, there is a segmentation error. What is the cause problem?
A. The domain priority is inconsistent
B. The cable was connected into the wrong port on the target switch.
C. A duplicate zone name exists on the switch you are adding.
D. The wrong cable type was used to connect the switches.
正解:C
質問 2:
What could be the possible problem if the expected disk drives do not appear to the Fible Channel host adapter?
A. adapter BIOS was not enabled
B. drive spin up was not enabled
C. device driver revision is incorrect
D. LUN was not masked by array software
正解:D
質問 3:
Which disk drive type relies on the host processor to perform all storage tasks?
A. SAS (Serial Attached SCSI)
B. Parallel ATA
C. SCSI
D. Fibre Channel
正解:B
質問 4:
An application administrator seeks to improve the I/O performance of the server's SAN-attached storage. Which HBA parameter setting change can affect the performance?
A. Queue Depth
B. NL-Port Mode
C. SCSI ID Mapping
D. PCI Connection Type
正解:A
質問 5:
Which two recovery risks exist, given backup of a multi-protocol NAS device taken from a client System through an active share? (choose two)
A. Loss of SMB files
B. Loss of CIFS meta data
C. Loss of ACL information
D. Loss of NFS meta data
正解:C,D
質問 6:
A customer's switch command line indicates that the status of port 4 is isolated. You know that port 4 is connected to a target device. What is the problem?
A. Domain ID inconsistency
B. port speed inconsistency
C. Fibre type mismatch
D. E_D_TOV mismatch
正解:D
質問 7:
Click the Exhibit button.
Servers in your environment are connected to one physical infrastructure which consists of different logical fabrics. Which feature do you use to implement this topology?
A. Zoning
B. NPIV
C. Virtual Fabric
D. Segmentation
正解:C
質問 8:
You are the system administrator of a medium-sized manufacturing company. The chief executive officer (CEO) is concerned about business continuity in case of a disaster. He constituted a project team to develop a business continuity and disaster recovery solution. The team is discussing replication strategies. What two (2) dependencies need to be considered in time-to-create and incremental re-establishment of a split mirror? (Choose two.)
A. LUN size
B. sector size
C. file system
D. LDM
E. changed data
正解:A,E
Mitoma -